North American Windpower
DOE Provides Superconductor Research Grants
in News Departments > New & Noteworthy
print the content item
The U.S. Department of Energy (DOE) has awarded a total of $51.8 million for five cost-shared projects intended to accelerate modernization of the electricity grid in the U.S.

This research will advance the development and application of high-temperature superconductors, which, according to DOE, have the potential to alleviate congestion on an electricity grid that is experiencing increased demand from consumers.

Among the selected projects are two initiatives by Westborough, Mass.-headquartered energy technology firm American Superconductor Corp. (AMSC). The company will lead the development of components required to commercially deploy an HTS power cable system powered by AMSC's second-generation (2G) high-temperature superconductivity wire - branded as 344 superconductors - in the Long Island Power Authority (LIPA) power grid.

In addition, AMSC has been selected to develop and perform in-grid testing of a three-phase 115-kV fault current limiter (FCL) using the company's 344 superconductors. This demonstration will occur at a location operated by team member Southern California Edison, AMSC adds.
Don't miss the latest wind energy news -- register to receive NAW's news headlines.



Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
NAW Mobile
Follow Us on Twitter

Power Climber_id1659
UEA_id1698
Upwind Solutions_id1629
Mankiewicz_id1700
NRG Systems JWT_id1677
Trachte Inc._id484
AWEA_id1658
Castrol