North American Windpower Iowa Dept Economics_id1626
enXco Secures Wind Turbines For Shiloh II Wind Farm
in News Departments > Projects & Contracts
print the content item
enXco Inc., a wind farm developer and operator based in Escondido, Calif., has purchased an additional 75 2 MW wind turbines from REpower Systems AG, a Germany-headquartered wind turbine manufacturer.

The turbines are destined for the Shiloh II wind farm located approximately 140 km northeast of San Francisco. According to the companies, 19 of the 75 turbines arise from an option arrangement with REpower that was negotiated in 2006. The delivery of the 2 MW turbines, which have a rotor diameter of 92 meters, is scheduled to begin mid-2008.

"Turbine availability during the period of the PTC [production tax credit] extension is critical to enXco's current and future success, and we are pleased that enXco can continue to move forward with its ambitious development plan thanks to our ability to secure turbines," says Tristan Grimbert, enXco's president and chief operating officer.
Don't miss the latest wind energy news -- register to receive NAW's news headlines.



Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Follow Us on Twitter
Play for Pink

Upwind Solutions_id1629
NRG Systems JWT_id1677
Mankiewicz_id1700
Power Climber_id1660
UEA_id1698
Trachte Inc._id484
Castrol
AWEA_id1658