in News Departments > Projects & Contracts
print the content item

Houston-based Horizon Wind Energy LLC, a subsidiary of EDP Renovaveis, hosted a ribbon-cutting celebration at the Lone Star Wind Farm in Texas. The Lone Star Wind Farm has an installed capacity of 400 MW of energy.

"We are proud to be doing business in the great state of Texas, the leading state for wind energy in the U.S.," says Antonio Martins da Costa, CEO of Horizon Wind Energy. "The Lone Star Wind Farm is important to the Horizon project portfolio, and we are grateful to those who made it possible, including J. Aron, our landowners and the supportive communities in Shackelford and Callahan counties."

The Lone Star Wind Farm has been in full operation since May. J. Aron, the commodities trading arm of Goldman Sachs, continues to purchase electricity from Phase II of the Lone Star Wind Farm. Direct Energy purchases 200 MW of energy produced by Phase I of the project.

SOURCE: Horizon Wind Energy


Trachte Inc._id1770
Latest Top Stories

Wind And Solar Are Catching Up With Nuclear Power, Says Report

A new report from the Worldwatch Institute says nuclear energy's share of global power production is steadily shrinking. Meanwhile, renewables' share keeps growing.


Could New Desert Plan Spell The End Of California Wind Energy Development?

The California Wind Energy Association says it is disappointed with the draft Desert Renewable Energy Conservation Plan, which was recently released by state and federal agencies.


New U.S. House Bill Includes Wind PTC Extension

U.S. representatives have introduced the Bridge to a Clean Energy Future Act of 2014, which would extend the production tax credit (PTC) and other provisions through 2016.


Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.

Canwea_id1984
Renewable NRG_id1934
Future Energy_id2008