North American Windpower Ingeteam_id1701
Nova Scotia Wind Farm Project Cancelled
in News Departments > FYI
print the content item
Black River Wind Ltd., a Nova Scotia-based wind power producer, has announced that its 6 MW project that was scheduled to be built in Inverness, Cape Breton and Pictou counties has been cancelled by Nova Scotia Power Inc. (NSPI), a subsidiary of Emera.

According to Black River Wind, the approximately $14 million project had received all of its federal and provincial approvals and was ready for construction, which was planned for completion by mid-2007.

"NSPI cancelled this $14 million dollar wind project in a disagreement over of the amount of a bond deposited to NSPI by Black River Wind," says Neal Livingston, Black River Wind's president. "We disagree completely with the cancellation of these contracts."

Black River Wind adds that the company is considering legal action over the cancellation of the project.
Don't miss the latest wind energy news -- register to receive NAW's news headlines.



Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Follow Us on Twitter
NAW Mobile

SandC Electric_id1674
Mankiewicz_id1700
NRG Systems JWT_id1677
Power Climber_id1660
Upwind Solutions_id1629
Trachte Inc._id484
Castrol
AWEA_id1658