in News Departments > Products & Technologies
print the content item

Springfield, Ohio-based R&M Materials Handling Inc. has debuted the LoadMate Electric Chain Hoist. With a load capacity of up to 1 ton, a lifting height of up to 262 feet, and a wide range of lifting speeds and power supplies, the LoadMate is ideal for wind turbine applications, the company says.

The product can be installed inside the wind turbine nacelle to assist with standard maintenance activities, including change-outs and repairs of generators, high-speed gears and yaw and pitch motors. The LoadMate is constructed of a highly durable yet lightweight pressure-cast aluminum with epoxy paint for corrosion resistance. The system features a ribbed design for better heat dissipation. The hoist uses precision gearing for smooth operation in wind turbines.

A torque limiter protects against overloads, and the hoist comes standard with upper and lower limit switches. The LoadMate is equipped with a safety latch for the detachable upper hook.

For more information, visit rmhoist.com.

IOWA Economic Development id2073

Trachte_id2056
Latest Top Stories

Slow Turning: What's Stopping Individual Blade Pitch Control From Wider Acceptance?

Advances have made it feasible for wind turbine blades to adjust individually. However, other factors are preventing the technology's widespread use.


Deepwater Hits Financial Close For Block Island Wind Farm, Expects Summer Construction

The Providence, R.I.-based offshore wind developer becomes the first to financially close on a U.S.-based offshore wind project.


More Investors Entering Tax Equity Market; Returns Holding Steady

The entry of new tax equity investors to the wind space last year re-ignited an old debate.


Report: Top 10 Turbine OEMs Had Record Year In 2014

Preliminary findings suggest Vestas reigned supreme again among the world's leading wind turbine makers. How did some of the other OEMs fare?


AWEA's Gramlich To FERC: Additional Transmission Needed Regardless Of Clean Power Plan

To further build a more balanced and reliable electricity portfolio, the U.S. needs to build more transmission capacity.

Hybrid Energy Innovations 2015