North American Windpower Ingeteam_id1701
DOD OKs Construction In New Report
in News Departments > Policy Watch
print the content item
The Department of Defense (DOD) recently released "The Effect of Windmill Farms on Military Readiness" report that states construction of wind farms can proceed, as long as the farms are not interrupting any national radar system.

In the report, the DOD notes that wind farms will be evaluated on a case-by-case basis, and the department will look at whether a project's number of turbines, heights and rotation will present challenges to radar systems. It states that the DOD will "allow construction of wind turbines, while maintaining defense readiness capabilities."

The report reveals that the location of a wind farm will be evaluated, as well as its proximity to military training, testing, and development and monitoring sites. The turbines also cannot impact the Federal Aviation Administration's U.S. airspace system, or the National Weather Service.

The report can be viewed at: www.defenselink.mil/pubs/pdfs/WindFarmReport.pdf

Don't miss the latest wind energy news -- register to receive NAW's news headlines.



Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Play for Pink
Follow Us on Twitter

Mankiewicz_id1700
UEA_id1698
Power Climber_id1660
NRG Systems JWT_id1677
Upwind Solutions_id1629
Trachte Inc._id484
Castrol
AWEA_id1658