in News Departments > New & Noteworthy
print the content item

Matthias Schubert, chief technical officer for Germany's REpower Systems AG, emphasized his company's commitment to investments in Quebec while speaking at an event sponsored by the German-Canadian Chamber of Commerce.

REpower has proposed to source steel towers, wind turbine blades and electrical modules from facilities based in the Gaspe and Matane regions of Quebec for a proposed Hydro-Quebec wind farm. Precise locations for these facilities remain in discussions.

REpower believes that its established supply partners are willing to invest in adequate production facilities if its request for proposals (RFP) bid is accepted.

According to the company, facilities in Quebec would be an integral part of REpower's global supply chain.

REpower submitted a bid under a Hydro-Quebec RFP in September 2007 as an exclusive supplier to the largest bidding consortium, St. Laurent Energies. This consortium submitted a bid with a total capacity of 1,048 MW, which, if selected, will be exclusively supplied by REpower turbines of the 2 MW class (MM82 and MM92).

These facilities would only be established in Quebec pending a successful and timely response from Hydro-Quebec, which is expected in the first half of the year.



Trachte Inc._id1770
Latest Top Stories

Kansas Renewables Mandate Survives Yet Another Attack, But Is It Too Early To Celebrate?

Over the past three years, some legislators have tried to either weaken or repeal the state's renewable portfolio standard, which requires Kansas utilities to reach 20% renewables by 2020.


AWEA Highlights U.S. Wind Success Stories Of 2013

Despite a 92% drop in new capacity last year, the sector still has myriad reasons to celebrate, according to a new report from the American Wind Energy Association.


Feds List New Bird Species As Threatened - Should Wind Developers Be Worried?

The U.S. Fish and Wildlife Service is designating the lesser prairie-chicken as threatened under the Endangered Species Act. An expert explains how this might affect the wind industry.


Senate Committee Passes Bill With Two-Year PTC Extension

The Senate Finance Committee has voted on a tax extenders package, which includes both the production tax credit (PTC) and investment tax credit, and sent it to the floor.


Five Common Gearbox Failures And How To Identify Them

Wind turbine gearbox failures are a major source of unplanned maintenance costs. An expert explains the most frequent failure modes and offers prevention tips.

WomenofWind_id
JLG_id1900
UEA_id1896
Acciona_id1907
AWEA_id1886
bonfiglioli_id1913