North American Windpower Mortenson_id1668
Port's Largest Crane Ready For Use
in News Departments > FYI
print the content item
The Port of Vancouver, one of the major ports on the Pacific Coast, has announced that the largest mobile harbor crane in North America - the LHM 500S - is officially in service.

The crane is the newest model from Austrian crane manufacturer Liebherr. It is capable of hoisting 140 metric tons up to a 60-foot outreach, and 100 metric tons at a 100-foot outreach. It weighs close to 500 tons, and with 80 wheels on 20 axle sets, it can turn in any direction, the port says.

"This heavy lift crane brings a whole new dimension for cargo handling in the Columbia River, positioning Vancouver as a premier project cargo port," says Larry Paulson, port executive director. "We already handled several large wind turbine projects, and this additional capability will open up new markets for the region to handle heavy or oversize equipment, generators and components for large-scale projects in the energy and transportation industries."

Powered by a 12-cylinder MAN diesel engine, the LHM500S is biodiesel-compatible, which is compliant with the port's policy to use alternative fuels.
Don't miss the latest wind energy news -- register to receive NAW's news headlines.



Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Follow Us on Twitter
Play for Pink

Power Climber_id1660
NRG Systems JWT_id1677
UEA_id1698
Mankiewicz_id1700
Upwind Solutions_id1629
Trachte Inc._id484
AWEA_id1658
Castrol