in News Departments > FYI
print the content item

The Port of Vancouver, one of the major ports on the Pacific Coast, has announced that the largest mobile harbor crane in North America - the LHM 500S - is officially in service.

The crane is the newest model from Austrian crane manufacturer Liebherr. It is capable of hoisting 140 metric tons up to a 60-foot outreach, and 100 metric tons at a 100-foot outreach. It weighs close to 500 tons, and with 80 wheels on 20 axle sets, it can turn in any direction, the port says.

"This heavy lift crane brings a whole new dimension for cargo handling in the Columbia River, positioning Vancouver as a premier project cargo port," says Larry Paulson, port executive director. "We already handled several large wind turbine projects, and this additional capability will open up new markets for the region to handle heavy or oversize equipment, generators and components for large-scale projects in the energy and transportation industries."

Powered by a 12-cylinder MAN diesel engine, the LHM500S is biodiesel-compatible, which is compliant with the port's policy to use alternative fuels.

IOWA Economic Development id2073

Trachte_id2056
Latest Top Stories

Slow Turning: What's Stopping Individual Blade Pitch Control From Wider Acceptance?

Advances have made it feasible for wind turbine blades to adjust individually. However, other factors are preventing the technology's widespread use.


Deepwater Hits Financial Close For Block Island Wind Farm, Expects Summer Construction

The Providence, R.I.-based offshore wind developer becomes the first to financially close on a U.S.-based offshore wind project.


More Investors Entering Tax Equity Market; Returns Holding Steady

The entry of new tax equity investors to the wind space last year re-ignited an old debate.


Report: Top 10 Turbine OEMs Had Record Year In 2014

Preliminary findings suggest Vestas reigned supreme again among the world's leading wind turbine makers. How did some of the other OEMs fare?


AWEA's Gramlich To FERC: Additional Transmission Needed Regardless Of Clean Power Plan

To further build a more balanced and reliable electricity portfolio, the U.S. needs to build more transmission capacity.

Hybrid Energy Innovations 2015