in News Departments > Projects & Contracts
print the content item

Horizon Wind Energy, a subsidiary of Energias de Portugal SA (EDP), has inaugurated the Prairie Star Wind Farm in southeastern Minnesota with 100.65 MW of installed generation power.

The project - the first to be launched since EDP acquired Horizon in July - includes 61 1.65 MW Vestas wind turbines in Clayton, Bennington, Marshall and Grand Meadow townships. Once it is fully operational in December, the wind farm will produce 362,000 MWh of clean energy and boost Horizon's net installed power capacity in the U.S. to 821 MW.

"North America has one of the fastest growing wind energy markets in the world, and we are fully committed to expansion in this region," says Antonio Mexia, EDP’s CEO. "EDP's long-standing track record of successful execution will ensure we achieve our ambitious goals."

The generated electricity from the Prairie Star farm will be purchased by Great River Energy of Elk River, the second largest wholesale electric power supplier in Minnesota. The power from Prairie Star Wind Farm will help Great River Energy meet its commitment to derive 20% of its electric energy from renewable resources by 2020.

IowaDeptEconDevel_id1863

Trachte Inc._id1770
Latest Top Stories

Kansas Renewables Mandate Survives Yet Another Attack, But Is It Too Early To Celebrate?

Over the past three years, some legislators have tried to either weaken or repeal the state's renewable portfolio standard, which requires Kansas utilities to reach 20% renewables by 2020.


AWEA Highlights U.S. Wind Success Stories Of 2013

Despite a 92% drop in new capacity last year, the sector still has myriad reasons to celebrate, according to a new report from the American Wind Energy Association.


Feds List New Bird Species As Threatened - Should Wind Developers Be Worried?

The U.S. Fish and Wildlife Service is designating the lesser prairie-chicken as threatened under the Endangered Species Act. An expert explains how this might affect the wind industry.


Senate Committee Passes Bill With Two-Year PTC Extension

The Senate Finance Committee has voted on a tax extenders package, which includes both the production tax credit (PTC) and investment tax credit, and sent it to the floor.


Five Common Gearbox Failures And How To Identify Them

Wind turbine gearbox failures are a major source of unplanned maintenance costs. An expert explains the most frequent failure modes and offers prevention tips.

Acciona_id1907
WomenofWind_id
JLG_id1900
UEA_id1896
AWEA_id1886
bonfiglioli_id1913