in News Departments > Products & Technologies
print the content item

This summer, Samsung Heavy Industries (SHI) will be testing the drivetrain for its 7 MW offshore wind turbine at a new facility at the U.K.-based National Renewable Energy Centre (Narec).

According to Narec, SHI's nacelle will be shipped to NAREC and used to commission the 15 MW-rated test center. Through a six-month program, the equipment will be performance tested under simulated offshore wind conditions. The Energy Technologies Institute is providing £25 million in funding to the facility.



IowaDeptEconDevel_id1863

Trachte Inc._id1770
Latest Top Stories

Smart Community Engagement: Twelve Tips Every Wind Developer Should Know

Community engagement helps ensure a project runs smoothly, but it can also save developers money and even lead to a more successful wind industry overall.


Bird Groups Target LEEDCo's Icebreaker Offshore Wind Pilot

Two bird conservation groups that helped halt a wind project earlier this year argue that Lake Erie Energy Development Corp.'s (LEEDCo) 18 MW offshore demo poses a major risk to regional wildlife.


Report Disputes U.S. Agency's Renewable Energy Projections

A new analysis from the Sun Day Campaign says renewables are slated to provide 16% of U.S. generating capacity by 2018 - over 20 years earlier than forecast by the Energy Information Administration.


Kansas Renewables Mandate Survives Yet Another Attack, But Is It Too Early To Celebrate?

Over the past three years, some legislators have tried to either weaken or repeal the state's renewable portfolio standard, which requires Kansas utilities to reach 20% renewables by 2020.


AWEA Highlights U.S. Wind Success Stories Of 2013

Despite a 92% drop in new capacity last year, the sector still has myriad reasons to celebrate, according to a new report from the American Wind Energy Association.

UEA_id1896
Acciona_id1907
WomenofWind_id
JLG_id1900
AWEA_id1886
bonfiglioli_id1913