in News Departments > Projects & Contracts
print the content item

GE says Invenergy has ordered three of its "brilliant" 2.5-120 wind turbines as part of an 86-turbine deal for a wind farm in Mills County, Texas.

The 2.5 MW unit, announced in January, harnesses the industrial Internet to analyze data points and help manage wind variability, provide predictable power and communicate with neighboring turbines.

In addition, the 2.5-120 wind turbine incorporates short-term battery storage, which GE says allows operators to utilize energy storage without the extra costs of a farm-level battery storage installation. The design integrates GE’s advanced Durathon Battery technology with three software applications.

“This new marriage of battery storage and advanced software within a wind turbine allows forward-thinking wind energy producers like Invenergy to shift the winds in its favor - increasing wind power’s efficiency and short-term predictability,” says GE’s Keith Longtin.

The 2.5-120 turbines are scheduled to be installed this year at the Goldthwaite Wind Energy facility, currently under construction in central Texas. The project is expected to commence full commercial operation by year-end.




Trachte Inc._id1770
Latest Top Stories

Quebec Government Postpones Wind Power RFP; No New Date Scheduled

The request for proposals (RFP) is part of an overall 800 MW wind power tranche that will serve as a bridge to the next phase in the province's energy future.


Setting The Record Straight: How Many Birds Do Wind Turbines Really Kill?

Several peer-reviewed studies are more or less in agreement with avian mortality rates caused by wind turbines. However, one study, which is wildly off from the others, is most often cited in the media. Why?


Six Takeaways From The IRS' Start Of Construction Guidance: What You Need To Know

The IRS recently issued guidance to wind developers to further spell out what "start of construction" means. Will you be covered?


Eagle Take Permits For Wind Farms - Will They Fly?

Now that the U.S. Fish and Wildlife Service has issued the first permit allowing the legal take of eagles, can wind developers expect more certainty in the agency's application process?


Despite 2013 Challenges, U.S. Wind Power Reaches All-Time Low Price

In a new report, the U.S. Department of Energy details the highs and lows of the country's wind industry last year, and the agency maintains that the U.S. sector remains strong.

Renewable NRG_id1934
Canwea_id1984
Tower Conference_id1965
UnitedEquip_id1995