in News Departments > Projects & Contracts
print the content item

Vestas has deployed three ZephIR 300 LIDAR systems at the 420 MW Macarthur Wind Farm in Australia. According to ZephIR, the systems will provide hub height and full rotor wind speed measurements across the project site, which already contains six traditional 84-meter met masts.

The ZephIR LIDARs will take wind measurements from 10 to 200 meters high to assist load-analysis calculations for the 140 3 MW Vestas V112 wind turbines, as well as to inform turbine-warranty conditions.

“ZephIR LIDAR gives Vestas flexibility on a large site, such as Macarthur,” comments Peter Giang, project manager at Vestas Australian Wind Technology. “It would be difficult from a development-application perspective to use traditional masts across the entire site to collect the data we require for our turbine calculations and to inform warranty conditions on the site. ZephIR provided an efficient way that we require.”



Trachte Inc._id1770
Latest Top Stories

Yearly Installed Capacity Figures Already Beat 2013 Numbers, More Wind On The Way: AWEA

While the American Wind Energy Association (AWEA) lobbies Congress to extend the production tax credit, the association notes wind projects now under construction signal a vibrant 2015.


Yahoo Inks Contract To Buy Kansas Wind Power

The Internet company plans to log in to the Alexander wind project, which is being built by community developer OwnEnergy.


Could Initial Offshore Wind Projects Crash New England's REC Market?

Some are concerned that the first offshore wind projects could negatively impact pricing of renewable energy credits (RECs) in New England.


Catching Up With The DOE's Down-Select Offshore Winners

The three recipients of key U.S. Department of Energy (DOE) funding provide updates on their offshore wind demonstration projects.


Texas Comptroller Attacks Wind Power, And Industry Fights Back

Texas Comptroller Susan Combs recently released a report calling for an end to wind power subsidies. The Wind Coalition has responded, saying the report is riddled with misinformation.

Canwea_id1984
Renewable NRG_id1934