in News Departments > Projects & Contracts
print the content item

Availon says it has signed a 10-year maintenance contract with NIBC European Infrastructure Fund (NEIF) for three wind farms in Germany.

The projects - which are located in Schnellin (Sachsen-Anhalt), Helmstedt (Niedersachsen) and Buddenstedt (Niedersachsen), Germany - consist of 19 Vestas V80 2 MW wind turbines, for a total installed capacity of 38 MW.

Under the contract, Availon will perform regular maintenance on the Vestas turbines twice a year, as well as unscheduled maintenance when required.




IowaDeptEconDevel_id1863

Helukabel_id1908
Latest Top Stories

Bird Groups Target LEEDCo's Icebreaker Offshore Wind Pilot

Two bird conservation groups that helped halt a wind project earlier this year argue that Lake Erie Energy Development Corp.'s (LEEDCo) 18 MW offshore demo poses a major risk to regional wildlife.


Report Disputes U.S. Agency's Renewable Energy Projections

A new analysis from the Sun Day Campaign says renewables are slated to provide 16% of U.S. generating capacity by 2018 - over 20 years earlier than forecast by the Energy Information Administration.


Kansas Renewables Mandate Survives Yet Another Attack, But Is It Too Early To Celebrate?

Over the past three years, some legislators have tried to either weaken or repeal the state's renewable portfolio standard, which requires Kansas utilities to reach 20% renewables by 2020.


AWEA Highlights U.S. Wind Success Stories Of 2013

Despite a 92% drop in new capacity last year, the sector still has myriad reasons to celebrate, according to a new report from the American Wind Energy Association.


Feds List New Bird Species As Threatened - Should Wind Developers Be Worried?

The U.S. Fish and Wildlife Service is designating the lesser prairie-chicken as threatened under the Endangered Species Act. An expert explains how this might affect the wind industry.

JLG_id1900
Acciona_id1907
UEA_id1896
WomenofWind_id
AWEA_id1886
bonfiglioli_id1913