in News Departments > Projects & Contracts
print the content item

Siemens has signed a deal with wpd group to supply and install 80 wind turbines for the 288 MW Butendiek offshore wind farm, which will be built in the North Sea.

The wind turbines, which have a capacity of 3.6 MW and a rotor diameter of 120 meters, will be installed in a 42 square-kilometer area located about 32 kilometers west of the island of Sylt, near the German-Danish border.

The agreement also covers a long-term maintenance contract for a period of 10 years. Siemens will also provide a new logistics concept that includes a service operation vessel specially developed for deployments to offshore wind facilities. The total contract is worth more than 700 million euros.

This project company is made up of five investors. Siemens Financial Services, Marguerite Fund, Industriens Pension and PKA A/S - each of which will indirectly hold 22.5% - will provide, as financial investors, a substantial portion of the required equity and have secured the financing of the project with a total project volume of 1.3 billion euros.

wpd group, which will hold a 10% stake in the project, will also contribute to the equity but will focus mainly on project development and project management. All of the partners have aligned their resources in order to secure a project finance structure on a 67% senior debt and 33% equity basis with a consortium of up to nine banks, Siemens notes.


Iowa Dept Economics

Hse SandyHook
Latest Top Stories

Study: How Northwest Wind Can Play With Energy Storage And Provide Operational Flexibility

Researchers have identified two possible sites in eastern Washington to build compressed-air energy-storage facilities that could temporarily store the Northwest’s abundant wind resources.


Wind Consortium Deploys Nacelle-Mounted LIDAR At Offshore Site In Irish Sea

In an important development for performance verification for offshore wind sites, a group of companies have deployed a nacelle-mounted LIDAR at DONG Energy's 367 MW Walney Wind Farm.


As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.

Power Climber_id1660
Renewable Energy Systems_id
SandC Electric_id1674
Upwind Solutions_id1629
Trachte Inc._id484
Castrol
AWEA_id1658