North American Windpower Iowa Dept Economics_id1626
Mainstream Renewable Power Secures Financing For Chilean Wind Farm
in News Departments > Projects & Contracts
print the content item
Wind and solar developer Mainstream Renewable Power has closed financing and started construction on its 33 MW Negrete Cuel Wind Farm in southern Chile. The wind farm, which is 100% owned by Mainstream, is expected to be fully operational by September.

The project has been financed without a power purchase agreement, and Mainstream will sell the energy directly into the spot market. China Development Bank has provided $52 million in senior project finance for the wind farm, and Chinese wind turbine manufacturer Goldwind is supplying the project with its GW87 1.5 MW wind turbines.

The project is part of Mainstream’s 2.3 GW wind and solar development portfolio in Chile. The company has been active in the Chilean market since 2009, when it partnered with local Chilean developer Andes Energy.

Don't miss the latest wind energy news -- register to receive NAW's news headlines.



Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Follow Us on Twitter
Play for Pink

Power Climber_id1660
NRG Systems JWT_id1677
SandC Electric_id1674
UEA_id1698
Mankiewicz_id1700
Trachte Inc._id484
Castrol
AWEA_id1658