in News Departments > Projects & Contracts
print the content item

UPC Wind, a wind power company based in Newton, Mass., has cleared a step in the approval process for its 40 MW Sheffield Wind Project by receiving a Certificate of Public Good from the Vermont Public Service Board.

Prior to the Vermont board's approval, the location of the project has been adjusted three times and different wind turbines have been selected to optimize the output from fewer turbines, UPC Wind says. The current proposed location for the project is a relatively low-lying ridgeline in Sheffield, Vt., near Interstate 91. It will be located on lands that are under active forest management.

In addition, UPC Wind worked with the Vermont Agency of Natural Resources to address wildlife issues. A total of 2,700 acres surrounding the project will be conserved as bear habitat, the company notes. UPC Wind now plans to open an office in the town of Sheffield and focus on completing construction plans.

Construction of the Sheffield Project is estimated to start next summer, according to a UPC spokesperson.


Trachte Inc._id1770
Latest Top Stories

Wind And Solar Are Catching Up With Nuclear Power, Says Report

A new report from the Worldwatch Institute says nuclear energy's share of global power production is steadily shrinking. Meanwhile, renewables' share keeps growing.


Could New Desert Plan Spell The End Of California Wind Energy Development?

The California Wind Energy Association says it is disappointed with the draft Desert Renewable Energy Conservation Plan, which was recently released by state and federal agencies.


New U.S. House Bill Includes Wind PTC Extension

U.S. representatives have introduced the Bridge to a Clean Energy Future Act of 2014, which would extend the production tax credit (PTC) and other provisions through 2016.


Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.

Renewable NRG_id1934
Canwea_id1984
Future Energy_id2008