North American Windpower Iowa Dept Economics_id1626
Massachusetts Looking For Company To Build Wind Turbine At Community College
in News Departments > RFP
print the content item
Massachusetts' Division of Capital Asset Management is seeking energy companies or contractors to purchase, design and install a wind turbine, as well as provide all other related services, at Bristol Community College in Fall River, Mass.

The commonwealth is interested in proposals that include all design, engineering, permitting, equipment purchase, equipment removal, equipment installation, rigging, piping, wiring, start-up, commissioning, a warranty and maintenance agreement and any other work required to install the wind turbine equipment.

Services are also requested for training in preventive maintenance and operation of the new equipment and maintenance services. Proposals should include details for a comprehensive service and maintenance agreement.

Proposals are due by Nov. 7. More information is available here.

Don't miss the latest wind energy news -- register to receive NAW's news headlines.

Iowa Dept Economics

Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
NAW Mobile
Follow Us on Twitter

NRG Systems JWT_id1677
SandC Electric_id1674
Upwind Solutions_id1629
Power Climber_id1659
Mankiewicz_id1700
Trachte Inc._id484
AWEA_id1658
Castrol