in News Departments > Products & Technologies
print the content item

Suzlon subsidiary REpower has expanded its 3.XM series of wind turbines by upgrading two of its existing models and introducing a new one.

The company says that two of its 3 MW wind turbine models - the 3.2M114 and the 3.4M104 - are being certified for use at sites with higher wind speeds.

The 3.4M104, which has a capacity of 3.4 MW, is particularly suitable for sites with high winds, REpower says, and it will be available beginning in 2014 in four hub heights - 80 meters, 93 meters, 100 meters and 128 meters - for IEC Class I sites.

The 3.2M114, which has a rated power of 3.2 MW, will be designed for sites with average wind speeds and will be available starting in mid-2013 in all three hub heights - 93 meters, 123 meters and 143 meters - in the corresponding IEC Class II wind class.

In addition to certification for IEC classes, the turbines are also being certified for the highest wind zones and terrain categories in accordance with the German DIBt guidelines.

In addition, REpower has introduced the 3.0M122 wind turbine, which is designed especially for low-wind sites. The new REpower 3.0M122 has a rated output of 3 MW and a rotor diameter of 122 meters. With a coated rotor surface of more than 11,600 square meters, it has the largest rotor diameter of any REpower onshore wind turbine.

The first version of the new turbine has a hub height of up to 139 meters and will be available starting in early 2013. The prototype will be erected in the fourth quarter of 2013.


Mortenson Construction_id2024

Trachte Inc._id1770
Latest Top Stories

Recapping The Wind Industry's Third-Quarter Deals

Mercom Capital Group recaps investment and merger and acquisition activity during July, August and September.


Yearly Installed Capacity Figures Already Beat 2013 Numbers, More Wind On The Way: AWEA

While the American Wind Energy Association (AWEA) lobbies Congress to extend the production tax credit, the association notes wind projects now under construction signal a vibrant 2015.


Yahoo Inks Contract To Buy Kansas Wind Power

The Internet company plans to log in to the Alexander wind project, which is being built by community developer OwnEnergy.


Could Initial Offshore Wind Projects Crash New England's REC Market?

Some are concerned that the first offshore wind projects could negatively impact pricing of renewable energy credits (RECs) in New England.


Catching Up With The DOE's Down-Select Offshore Winners

The three recipients of key U.S. Department of Energy (DOE) funding provide updates on their offshore wind demonstration projects.

Renewable NRG_id1934
Canwea_id1984
Hybrid Energy Innovations 2015