in News Departments > People
print the content item

Availon says it is a certified authorized service provider for Winergy Drive Systems Corp., a provider of wind turbine drivetrain components, including gearboxes, couplings and generators.

To gain certification, Availon says its engineers and technicians received hands-on training at Winergy's Elgin, Ill.-based plant, where Availon employees were schooled in up-tower gearbox repair on GE's 1.5 MW wind turbines.

As a result, Availon says it is certified in borescope services for identifiying gear and bearing damage inside the gearbox; high-speed bearing replacement; high-speed shaft replacement; intermediate-speed bearing replacement (generator side only); intermediate-speed shaft replacement; low-speed bearing replacement (generator side only); and pitch tube replacement and/or repair.

All works performed by factory-trained Availon technicians is covered under Winergy's standard one-year warranty. In addition to the certified services, Availon is stocking Winergy-manufactured parts needed for repair and replacement of gearbox components at Availon’s Des Moines, Iowa, and Sweetwater, Texas, distribution centers.


Trachte Inc._id1770
Latest Top Stories

The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.


Why States Should Adopt A Renewable Portfolio Standard

A new study analyzes the potential benefits of state renewable energy mandates, as well as recommends what such policies should include.


Sen. Reid Vows To Bring Wind PTC To A Vote By Year's End

Nevada's senior senator provides some encouragement to wind industry advocates during his annual Clean Energy Summit.


Steadily, Wind Turbine OEMs Resume R&D Investment

An increased commitment to research and development will likely lead to wind energy innovation - not to mention a likely increase in patent-protected technology.


Quebec Government Postpones Wind Power RFP; No New Date Scheduled

The request for proposals (RFP) is part of an overall 800 MW wind power tranche that will serve as a bridge to the next phase in the province's energy future.

Canwea_id1984
Renewable NRG_id1934
Future Energy_id2008
UnitedEquip_id1995