North American Windpower Iowa Dept Economics_id1626
Postensa Completes Construction Of Wind Turbine Tower
in News Departments > Projects & Contracts
print the content item
Postensa Wind Structures says it has completed the construction of a 100-meter pre-cast, post-tensioned wind tower in Illinois for a Clipper C96 2.5 MW wind turbine.

All of the components for the installation were produced and built locally, the company notes.

An official ribbon-cutting ceremony will be held in Sublette, Ill., on May 31.

Don't miss the latest wind energy news -- register to receive NAW's news headlines.

Iowa Dept Economics

Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Follow Us on Twitter
NAW Mobile

Upwind Solutions_id1629
NRG Systems JWT_id1677
SandC Electric_id1674
UEA_id1698
Mankiewicz_id1700
Trachte Inc._id484
AWEA_id1658
Castrol