in News Departments > Projects & Contracts
print the content item

Wind Works Power Corp. (WWPW) will acquire a controlling interest in Skyway 126 Wind Energy Inc. The company has signed an agreement to acquire a 70% interest in Skyway 126 in exchange for 2 million restricted shares of WWPW's common stock.

Skyway 126 is a 10 MW project with a potential investment value of C$30 million, according to the company. The project is located in Grey-Highlands Township, Ontario.

"This acquisition increases our portfolio of development projects to 30 MW," says Ingo Stuckmann, CEO of WWPW. "Our plan is to continue to build our project portfolio to a minimum of 400 MW over the next year."

Environmental studies are near completion, and the project is eligible for a feed-in tariff (FIT) application during the Ontario Power Authority launch period. WWPW intends to submit an application for the FIT power purchase contract fixed at C$135/MWh over a 20-year term on or before the Nov. 30 deadline.

SOURCE: Wind Works Power Corp.



Trachte Inc._id1770
Latest Top Stories

Wind And Solar Are Catching Up With Nuclear Power, Says Report

A new report from the Worldwatch Institute says nuclear energy's share of global power production is steadily shrinking. Meanwhile, renewables' share keeps growing.


Could New Desert Plan Spell The End Of California Wind Energy Development?

The California Wind Energy Association says it is disappointed with the draft Desert Renewable Energy Conservation Plan, which was recently released by state and federal agencies.


New U.S. House Bill Includes Wind PTC Extension

U.S. representatives have introduced the Bridge to a Clean Energy Future Act of 2014, which would extend the production tax credit (PTC) and other provisions through 2016.


Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.

Renewable NRG_id1934
Canwea_id1984
Future Energy_id2008