in News Departments > Projects & Contracts
print the content item

CPS Energy, a San Antonio, Texas-based municipally owned natural gas and electricity supplier, has signed a 20-year power purchase agreement with Babcock & Brown and Rutland, Vt.-based Catamount Energy to obtain additional energy from the Cottonwood Creek Wind Farm located in Nolan County, Texas. Babcock & Brown and Catamount Energy funded the development and construction of the wind farm.

The Cottonwood Creek Wind Farm was completed in 2005. An additional 181 turbines, capable of generating 240 MW of electricity for CPS Energy, are currently being constructed, the company says. The second phase of the project is scheduled to be complete by late spring of 2007.

CPS Energy already receives wind power from Cottonwood Creek and the Desert Sky Wind Farm in western Texas. According to CPS Energy, its customers can purchase renewable energy certificates in blocks of 100 kWh for $3 each through its Windtricity program.


Trachte Inc._id1770
Latest Top Stories

Wind And Solar Are Catching Up With Nuclear Power, Says Report

A new report from the Worldwatch Institute says nuclear energy's share of global power production is steadily shrinking. Meanwhile, renewables' share keeps growing.


Could New Desert Plan Spell The End Of California Wind Energy Development?

The California Wind Energy Association says it is disappointed with the draft Desert Renewable Energy Conservation Plan, which was recently released by state and federal agencies.


New U.S. House Bill Includes Wind PTC Extension

U.S. representatives have introduced the Bridge to a Clean Energy Future Act of 2014, which would extend the production tax credit (PTC) and other provisions through 2016.


Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.

Canwea_id1984
Renewable NRG_id1934
Future Energy_id2008