in News Departments > RFP
print the content item

The Massachusetts Water Resources Authority (MWRA) has issued a request for proposals (RFP) to design, furnish and install two 600 kW wind turbine generators at the Deer Island Treatment Plant (DITP) in Boston.

Submissions for the RFP will be received at MWRA's Document Distribution Department, First floor, 100 First Ave., Charlestown Navy Yard, Boston, MA 02129, and will be opened and read publicly on Sept. 25 at 2 p.m.

A site visit will be held on Aug. 12 at 10 a.m. at the DITP.

Deadline: Sept. 17

For more information: mwra.state.ma.us


Trachte Inc._id1770
Latest Top Stories

Could New Desert Plan Spell The End Of California Wind Energy Development?

The California Wind Energy Association says it is disappointed with the draft Desert Renewable Energy Conservation Plan, which was recently released by state and federal agencies.


New U.S. House Bill Includes Wind PTC Extension

U.S. representatives have introduced the Bridge to a Clean Energy Future Act of 2014, which would extend the production tax credit (PTC) and other provisions through 2016.


Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.


Why States Should Adopt A Renewable Portfolio Standard

A new study analyzes the potential benefits of state renewable energy mandates, as well as recommends what such policies should include.

Canwea_id1984
Renewable NRG_id1934
UnitedEquip_id1995
Future Energy_id2008