in News Departments > RFP
print the content item

The Massachusetts Water Resources Authority (MWRA) has issued a request for proposals (RFP) to design, furnish and install two 600 kW wind turbine generators at the Deer Island Treatment Plant (DITP) in Boston.

Submissions for the RFP will be received at MWRA's Document Distribution Department, First floor, 100 First Ave., Charlestown Navy Yard, Boston, MA 02129, and will be opened and read publicly on Sept. 25 at 2 p.m.

A site visit will be held on Aug. 12 at 10 a.m. at the DITP.

Deadline: Sept. 17

For more information: mwra.state.ma.us


Trachte Inc._id1770
Latest Top Stories

Alberta Breaks Wind Power Record, Then Does It Again

Last week, the Alberta Electric System Operator recorded new wind production peaks in the Canadian province - highlighting how well the grid integrated the renewable energy.


Federal Appeals Court Finds Obama's Wind Farm Decision Unconstitutional

A federal appeals court ruled that the U.S. government violated the constitutional rights of Chinese-owned Ralls Corp. when ordering the divestment of four Oregon wind farms.


Renewables Make Up Over 50% Of New U.S. Power In First Half Of 2014

According to a recent government report, renewable energy sources, such as wind and solar, continue to dominate new electric generating capacity.


Suzlon Facility Lends Key Assist In Developing 'The Wind Technicians Of Tomorrow'

The turbine manufacturer’s Elgin, Ill.-based training facility is the culmination of a program that puts a new twist on a proven method of instruction.


Having Their Say: CanWEA Clarifies True Source Of Canadian Wind Success

The Canadian Wind Energy Association (CanWEA) takes issue with a recent report summary regarding various renewable energy policies in North America.

Navigant_id1983
Canwea_id1984
Renewable NRG_id1934