in News Departments > Projects & Contracts
print the content item

The Bingham County Planning and Zoning Commission (PZC) has approved a special-use permit for the Goshen South wind farm. The permit gives Ridgeline Energy approval to build 150 wind turbines on leased land in Bingham County, Idaho. The wind farm will have the capability to generate up to 450 MW of electricity.

According to Ridgeline, the project will rely primarily on improving existing public and farm roads to meet the wind farm's needs for road access.

"We love this area and want to see it maintain its rural character," says landowner Kelly Bingham. "The wind farm will help us hold onto our land and keep it available for farming, ranching, recreation and wildlife habitat."

Construction of the wind farm could begin in 2009 and will require more than 200 workers, according to the company.


Trachte Inc._id1770
Latest Top Stories

Wind And Solar Are Catching Up With Nuclear Power, Says Report

A new report from the Worldwatch Institute says nuclear energy's share of global power production is steadily shrinking. Meanwhile, renewables' share keeps growing.


Could New Desert Plan Spell The End Of California Wind Energy Development?

The California Wind Energy Association says it is disappointed with the draft Desert Renewable Energy Conservation Plan, which was recently released by state and federal agencies.


New U.S. House Bill Includes Wind PTC Extension

U.S. representatives have introduced the Bridge to a Clean Energy Future Act of 2014, which would extend the production tax credit (PTC) and other provisions through 2016.


Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.

Canwea_id1984
Renewable NRG_id1934
Future Energy_id2008