in News Departments > FYI
print the content item

NACEL Energy is deploying wind energy measurement and assessment systems from NRG Systems Inc. to bring 80 MW of new wind power online by 2010. These systems are being deployed at the Blue Creek and Channing Flats wind projects in west Texas.

"NACEL Energy is combining advanced technology from NRG with our operation team's decades of experience to ensure our projects produce clean energy from wind effectively and efficiently," says Brian Lavery, president of NACEL Energy. "With Blue Creek and Channing Flats, NACEL Energy now has 40 MW of new wind power under development, bringing us half-way to achieving our 80 MW objective."




Trachte Inc._id1770
Latest Top Stories

Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.


Why States Should Adopt A Renewable Portfolio Standard

A new study analyzes the potential benefits of state renewable energy mandates, as well as recommends what such policies should include.


Sen. Reid Vows To Bring Wind PTC To A Vote By Year's End

Nevada's senior senator provides some encouragement to wind industry advocates during his annual Clean Energy Summit.


Steadily, Wind Turbine OEMs Resume R&D Investment

An increased commitment to research and development will likely lead to wind energy innovation - not to mention a likely increase in patent-protected technology.

Canwea_id1984
Renewable NRG_id1934
UnitedEquip_id1995
Future Energy_id2008