in News Departments > Products & Technologies
print the content item

Alstom has announced an upgrade to its ECO122 wind turbine from 2.7 MW to 3 MW, as well as a new partnership to develop higher towers for less windy sites.

Following measurements taken over a two-month period on an initial ECO122 unit installed in Wieringermeer, Netherlands, ECN1 has certified the machine as a 3 MW turbine.

Alstom has also signed a global partnership with Freyssinet to develop a 119-meter concrete tower specifically designed for its ECO122 wind turbine. This new tower will be made of 11 concrete sections, the lowest measuring 7.2 meters in diameter, for the base of the structure.

This partnership is in addition to a previously signed memorandum of understanding with Max Bogl Wind AG3 to develop a 139-meter tower for the ECO122. Alstom says it will offer its customers both high-tower options, which are suited to harness the stronger winds found at higher altitudes.



Trachte Inc._id1770
Latest Top Stories

Eagle Take Permits For Wind Farms - Will They Fly?

Now that the U.S. Fish and Wildlife Service has issued the first permit allowing the legal take of eagles, can wind developers expect more certainty in the agency's application process?


Despite 2013 Challenges, U.S. Wind Power Reaches All-Time Low Price

In a new report, the U.S. Department of Energy details the highs and lows of the country's wind industry last year, and the agency maintains that the U.S. sector remains strong.


Mexico On Pace To Set New Renewables Investment Record

A new report says the country has spent $1.3 billion on clean energy in the first half of 2014 and could end up seeing a record year. Furthermore, wind power is slated for significant growth in the region.


IRS Issues More PTC Guidance, Easing Some Wind Industry Concerns

The Internal Revenue Service (IRS) addresses how much work is needed on a wind farm to satisfy production tax credit (PTC) eligibility.


Embryonic No More: U.S. Offshore Wind Industry Gaining Momentum

After a decade of fits and starts, the industry is moving closer to installing the first generation of wind projects off the country's shores.

Canwea_id1984
Renewable NRG_id1934
Tower Conference_id1965