in News Departments > Projects & Contracts
print the content item

Gamesa has signed a deal to supply Iberdrola with turbines for a 202 MW wind project in southern Texas.

Under the agreement, Gamesa will provide 101 of its G97-2.0 MW machines for the Baffin wind farm, marking the company's largest single order for the turbine model. The turbines are scheduled for delivery mid-2014, and the facility is slated for commissioning toward the end of next year.

The Baffin project is still under development, and the decision to proceed is contingent upon local government approval. However, Gamesa says Iberdrola is well positioned to utilize the 202 MW of turbines at other possible U.S. sites.

The Baffin wind project is the last phase of Iberdrola's Penascal complex, which once commissioned, will have a capacity of 606 MW.





Trachte Inc._id1770
Latest Top Stories

Wind And Solar Are Catching Up With Nuclear Power, Says Report

A new report from the Worldwatch Institute says nuclear energy's share of global power production is steadily shrinking. Meanwhile, renewables' share keeps growing.


Could New Desert Plan Spell The End Of California Wind Energy Development?

The California Wind Energy Association says it is disappointed with the draft Desert Renewable Energy Conservation Plan, which was recently released by state and federal agencies.


New U.S. House Bill Includes Wind PTC Extension

U.S. representatives have introduced the Bridge to a Clean Energy Future Act of 2014, which would extend the production tax credit (PTC) and other provisions through 2016.


Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.

Canwea_id1984
Renewable NRG_id1934
Future Energy_id2008