in News Departments > New & Noteworthy
print the content item

In a deal that highlights the importance of the production tax credit (PTC), Vestas has received a 60 MW order from affiliates of Renewable Energy Systems Americas Inc. (RES Americas) to be used for wind energy projects in the U.S. Ultimately, Vestas says it could supply RES Americas up to 610 MW.

Details about the projects' names and locations were not disclosed. However, Vestas says each project will use its V100-2.0 MW turbine, and deliveries and commissioning are expected to occur in 2014 and 2015.

“We are very pleased to have finalized this agreement with Vestas,” says Susan Reilly, president and CEO of RES Americas. “This is a great example of how the ‘start of construction’ language in the current production tax credit for wind energy is generating increased spending and creating U.S. manufacturing jobs.

“This purchase, which we expect to increase as these projects move forward, would not have occurred but for the decision Congress made to qualify any project that starts this year,” Reilly continues.

Chris Brown, president of Vestas’ sales and service division in the U.S. and Canada, agrees that the PTC plays a crucial role in the wind sector.

“Transactions like this underscore the value delivered by the production tax credit and the importance of extending it beyond its current expiration at the end of 2013,” comments Brown. He adds that Vestas’ U.S. manufacturing facilities will be producing the wind turbines for the RES deal.

Vestas previously worked with RES to supply 139 V90-1.8 MW turbines for the Cedar Point wind energy project. Located near Limon, Colo., the wind farm became operational in 2011.




IowaDeptEconDevel_id1863

Helukabel_id1908
Latest Top Stories

Kansas Renewables Mandate Survives Yet Another Attack, But Is It Too Early To Celebrate?

Over the past three years, some legislators have tried to either weaken or repeal the state's renewable portfolio standard, which requires Kansas utilities to reach 20% renewables by 2020.


AWEA Highlights U.S. Wind Success Stories Of 2013

Despite a 92% drop in new capacity last year, the sector still has myriad reasons to celebrate, according to a new report from the American Wind Energy Association.


Feds List New Bird Species As Threatened - Should Wind Developers Be Worried?

The U.S. Fish and Wildlife Service is designating the lesser prairie-chicken as threatened under the Endangered Species Act. An expert explains how this might affect the wind industry.


Senate Committee Passes Bill With Two-Year PTC Extension

The Senate Finance Committee has voted on a tax extenders package, which includes both the production tax credit (PTC) and investment tax credit, and sent it to the floor.


Five Common Gearbox Failures And How To Identify Them

Wind turbine gearbox failures are a major source of unplanned maintenance costs. An expert explains the most frequent failure modes and offers prevention tips.

UEA_id1896
WomenofWind_id
JLG_id1900
Acciona_id1907
bonfiglioli_id1913
AWEA_id1886