in News Departments > Projects & Contracts
print the content item

Last week, Kruger Energy held a dedication ceremony at its 100 MW wind farm in Monteregie, Quebec.

The project, which was commissioned in December 2012, consists of 44 2.3-MW wind turbines from Enercon. The machines are installed in five Monteregie municipalities, namely Saint-Isidore, Saint-Remi, Saint-Michel, Saint-Constant and Mercier. Hydro-Quebec Distribution is purchasing the project’s output under a 20-year contract.

Kruger notes the Monteregie project represents more than C$300 million in investments, and the wind farm is the company’s first in Quebec and its third in Canada. 

The official ceremony was attended by Joseph Kruger II, chairman and CEO of Kruger Inc.; Gaetan Lelievre, minister for Regions and minister responsible for the Gaspesie-Iles-de-la-Madeleine region; several local elected officials; and local residents.




Trachte Inc._id1770
Latest Top Stories

Wind And Solar Are Catching Up With Nuclear Power, Says Report

A new report from the Worldwatch Institute says nuclear energy's share of global power production is steadily shrinking. Meanwhile, renewables' share keeps growing.


Could New Desert Plan Spell The End Of California Wind Energy Development?

The California Wind Energy Association says it is disappointed with the draft Desert Renewable Energy Conservation Plan, which was recently released by state and federal agencies.


New U.S. House Bill Includes Wind PTC Extension

U.S. representatives have introduced the Bridge to a Clean Energy Future Act of 2014, which would extend the production tax credit (PTC) and other provisions through 2016.


Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.

Renewable NRG_id1934
Canwea_id1984
Future Energy_id2008