ABB_id2059
in News Departments > Projects & Contracts
print the content item

Siemens reports it has received a 30 MW order to repower the Bassens I community wind farm, located in Germany.

Under the agreement, Siemens will supply, install and commission 10 of its SWT-3.0-113 gearless wind turbines. The wind farm, which was built in 1997, currently features 34 600 kW machines and has an installed capacity of 24.2 MW.

Wind turbine installation is scheduled to begin later this year, with commissioning slated for the coming winter. Siemens will also be responsible for maintenance of the equipment over a period of 15 years.


Hybrid Energy Innovations 2015

Trachte_id2056
Latest Top Stories

The Song Remains The Same: AWEA Says Stable Policy Can Protect U.S. Wind Investment

Although the U.S. wind industry added more than four times the amount of wind in 2014 compared with 2013, predictable policy is needed to sustain its long-term success.


High Net-Worth Investors Claim 'All Of The Above' On Energy, Renewable And Otherwise

According to a recent Morgan Stanley poll, high-dollar investors favor investment in renewable energy technologies, such as wind and solar.


U.S. Wind Power Installations Surpassed 4.7 GW Last Year, Although China Still Leads

Bloomberg New Energy Finance reports that U.S. wind installations came back in a big way from a disappointing 2013.


IRS Specifies Performance, Quality Standards For Small Wind Turbines

The Internal Revenue Service (IRS) recently issued guidelines creating safety and performance standards for small wind turbines to be eligible for the 30% investment tax credit.


Hot Times North Of The Border: Canada Tops Previous Record For Installed Wind Capacity

For the second consecutive year, Canada's wind market has bested the country's previous mark for new installations.

Hybrid Energy Innovations 2015