in News Departments > Products & Technologies
print the content item

Substantial investments made to its technical center last year now enable turbine manufacturer Nordex to increase its wind turbine testing capabilities.

From its Rostock, Germany, production site, Nordex is performing advanced tests of its Generation Gamma and Generation Delta wind turbines and related components.

Nordex notes the installation of 15 testing facilities, including an azimuth and motor/vibration test rig, enable better quality control for the testing of core components fitted to the company's turbines. The company says its climate chamber - which can simulate temperatures from -40 degrees C to 60 degrees C - gives it a greater understanding of how components operate in extreme conditions.

"In addition to larger rotors, a greater installed capacity and growing tower heights, real-life conditions at wind turbine sites, which can be quite harsh in some places, are increasingly playing a role in the development of our systems," explains Dr. Jurgen Zeschky, the company's CEO. "Our turbines must operate perfectly in extreme cold or heat, in icy or very humid conditions and under different grid conditions."


Trachte Inc._id1770
Latest Top Stories

Despite 2013 Challenges, U.S. Wind Power Reaches All-Time Low Price

In a new report, the U.S. Department of Energy details the highs and lows of the country's wind industry last year, and the agency maintains that the U.S. sector remains strong.


Mexico On Pace To Set New Renewables Investment Record

A new report says the country has spent $1.3 billion on clean energy in the first half of 2014 and could end up seeing a record year. Furthermore, wind power is slated for significant growth in the region.


IRS Issues More PTC Guidance, Easing Some Wind Industry Concerns

The Internal Revenue Service (IRS) addresses how much work is needed on a wind farm to satisfy production tax credit (PTC) eligibility.


Embryonic No More: U.S. Offshore Wind Industry Gaining Momentum

After a decade of fits and starts, the industry is moving closer to installing the first generation of wind projects off the country's shores.


AWEA: U.S. Installs 853 MW Of Wind In First Half Of 2014

The American Wind Energy Association (AWEA) reveals the U.S. industry's progress thus far this year and underscores the importance of policy certainty.

Renewable NRG_id1934
Canwea_id1984
Tower Conference_id1965