in News Departments > FYI
print the content item

The National Renewable Energy Laboratory (NREL) has announced the 182,500-square-foot Energy Systems Integration Facility (ESIF), a facility to help both public- and private-sector researchers scale up clean energy technologies and test how they interact with each other and the grid at utility scale.

Located at NREL's campus in Golden, Colo., the facility is designed to allow researchers to test everything from solar modules and wind turbines to electric vehicles and efficient home appliances.

NREL says ESIF will house more than 15 experimental laboratories and several outdoor test beds, including an interactive hardware-in-the-loop system that lets researchers and manufacturers test their products at full power and real grid load levels.

The Energy Systems Integration Facility is the latest addition to the U.S. Energy Department’s national network of user facilities that provide scientists and engineers with open access to various advanced instruments and tools. Corporate users pay the full cost of conducting research and retain their intellectual property and data rights, while users that agree to publish their research results are charged a discounted fee.




Trachte Inc._id1770
Latest Top Stories

Quebec Government Postpones Wind Power RFP; No New Date Scheduled

The request for proposals (RFP) is part of an overall 800 MW wind power tranche that will serve as a bridge to the next phase in the province's energy future.


Setting The Record Straight: How Many Birds Do Wind Turbines Really Kill?

Several peer-reviewed studies are more or less in agreement with avian mortality rates caused by wind turbines. However, one study, which is wildly off from the others, is most often cited in the media. Why?


Six Takeaways From The IRS' Start Of Construction Guidance: What You Need To Know

The IRS recently issued guidance to wind developers to further spell out what "start of construction" means. Will you be covered?


Eagle Take Permits For Wind Farms - Will They Fly?

Now that the U.S. Fish and Wildlife Service has issued the first permit allowing the legal take of eagles, can wind developers expect more certainty in the agency's application process?


Despite 2013 Challenges, U.S. Wind Power Reaches All-Time Low Price

In a new report, the U.S. Department of Energy details the highs and lows of the country's wind industry last year, and the agency maintains that the U.S. sector remains strong.

Renewable NRG_id1934
Canwea_id1984
UnitedEquip_id1995
Tower Conference_id1965