in News Departments > New & Noteworthy
print the content item

The Quebec government announced the province's intention to secure an additional block of 800 MW of wind power capacity.

Wind industry suppliers and developers had been anxiously awaiting the announcement, which many contend will serve as the bridge to Quebec's future energy plans.

This new wind power capacity will be allocated as follows:
  • 150 MW for a project currently being developed by the Mi’gmawei Mawiomi in the Gaspesie region;
  • 150 MW for projects throughout Quebec, which will be awarded through a call for tenders process;
  • 200 MW for Hydro-Quebec Production; and
  • 300 MW for wind projects located in the Gaspesie or Bas-Saint-Laurent regions, which will also be awarded through a call for tenders process.
The calls for tenders will target projects developed by local communities and cooperatives in partnership with private developers.

"The announcement is a positive step forward, but in order to see real concrete economic benefits, these projects will need to be built in the near future," said Jean François Nolet, vice president of policy and government affairs at the Canadian Wind Energy Association. "As such, the members of the wind industry must join forces to ensure the additional 800 MW are installed between 2016 and 2017. The wind energy industry will continue to work with the government to achieve that goal.”

Although Quebec wind farm construction remains vibrant in the near term, many wind industry advocates were worried that development would come to a screeching halt after 2015, when the last of the wind farms approved under Quebec’s third power call become grid connected.

The additional block of wind power should allow Quebec to meet its goal of approximately 4,000 MW of wind power capacity in compliance with its 2006-2015 Energy Strategy.

IowaDeptEconDevel_id1863

Helukabel_id1908
Latest Top Stories

Smart Community Engagement: Twelve Tips Every Wind Developer Should Know

Community engagement helps ensure a project runs smoothly, but it can also save developers money and even lead to a more successful wind industry overall.


Bird Groups Target LEEDCo's Icebreaker Offshore Wind Pilot

Two bird conservation groups that helped halt a wind project earlier this year argue that Lake Erie Energy Development Corp.'s (LEEDCo) 18 MW offshore demo poses a major risk to regional wildlife.


Report Disputes U.S. Agency's Renewable Energy Projections

A new analysis from the Sun Day Campaign says renewables are slated to provide 16% of U.S. generating capacity by 2018 - over 20 years earlier than forecast by the Energy Information Administration.


Kansas Renewables Mandate Survives Yet Another Attack, But Is It Too Early To Celebrate?

Over the past three years, some legislators have tried to either weaken or repeal the state's renewable portfolio standard, which requires Kansas utilities to reach 20% renewables by 2020.


AWEA Highlights U.S. Wind Success Stories Of 2013

Despite a 92% drop in new capacity last year, the sector still has myriad reasons to celebrate, according to a new report from the American Wind Energy Association.

JLG_id1900
WomenofWind_id
UEA_id1896
Acciona_id1907
bonfiglioli_id1913
AWEA_id1886