in News Departments > Projects & Contracts
print the content item

Iberdrola has commissioned the El Candal and El Segredal wind farms. The projects are the company's first two wind power facilities in Asturias, Spain, and have a combined capacity of 74 MW.

The El Candal wind farm is located between the towns of Castropol and Boal. Equipped with 19 wind turbines, it has a capacity of 38 MW. With 18 wind turbines, El Segregal is located in Villayon and has a capacity of 36 MW.

Iberdrola's engineering subsidiary was in charge of building and commissioning both wind farms. Both facilities are equipped with Gamesa G80 turbines, which stand 67 meters high and have a rotor diameter of 80 meters.



Trachte Inc._id1770
Latest Top Stories

Are Fitch Ratings' Claims About Wind Farm Underperformance Unfounded?

A recent report from Fitch Ratings suggests that wind farms underperform due to an overestimation of wind resources, but AWS Truepower says the analysis misses the mark.


SunEdison Buying First Wind In $2.4 Billion Deal

Global solar company SunEdison and its yeildco have announced an agreement to buy the Boston-based developer, a major player in the U.S. wind industry.


U.S., China Reach Ambitious Climate Change Accord

The agreement between the global superpowers leans heavily on the deployment of renewable energy, such as wind and solar.


What The Midterm Elections Mean For The U.S. Wind Industry

Both chambers of Congress are now under Republican control for the first time since 2006. How will wind energy fare?


GE Blade Crashes At Mehoopany Wind Farm In Pennsylvania

The turbine manufacturer says the Nov. 2 incident is "isolated and unrelated" when compared to earlier blade issues.

Hybrid Energy Innovations 2015
Renewable NRG_id1934
BG 2015DblBox_id2032