in News Departments > Products & Technologies
print the content item

Germanischer Lloyd (GL) has approved 3B-the fibreglass company's HiPer-tex W2020 direct roving product, which is used for wind turbine blade applications.

This new certification complements the recent GL approval for SE2020 single-end reinforcements. Both products feature proprietary sizings developed for use with specific resin systems (epoxy), principally for the manufacture of non-crimped fabrics and FRP laminates for applications in, but not exclusively, wind turbine blades.


Mortenson Construction_id2024

Trachte Inc._id1770
Latest Top Stories

Yearly Installed Capacity Figures Already Beat 2013 Numbers, More Wind On The Way: AWEA

While the American Wind Energy Association (AWEA) lobbies Congress to extend the production tax credit, the association notes wind projects now under construction signal a vibrant 2015.


Yahoo Inks Contract To Buy Kansas Wind Power

The Internet company plans to log in to the Alexander wind project, which is being built by community developer OwnEnergy.


Could Initial Offshore Wind Projects Crash New England's REC Market?

Some are concerned that the first offshore wind projects could negatively impact pricing of renewable energy credits (RECs) in New England.


Catching Up With The DOE's Down-Select Offshore Winners

The three recipients of key U.S. Department of Energy (DOE) funding provide updates on their offshore wind demonstration projects.


Texas Comptroller Attacks Wind Power, And Industry Fights Back

Texas Comptroller Susan Combs recently released a report calling for an end to wind power subsidies. The Wind Coalition has responded, saying the report is riddled with misinformation.

Canwea_id1984
Renewable NRG_id1934