North American Windpower Mortenson_id1668
Strategic Marine Delivers Offshore Installation Vessel
in News Departments > FYI
print the content item
Strategic Marine, a shipbuilder operating in Singapore and Vietnam, has delivered the Njord Curlew - a crew transfer and service vessel - to Njord Offshore, a U.K. fleet operator that specializes in supply services for the offshore wind energy sector.

This is the third of eight vessels that will be used for Njord Offshore. The eight vessels, to be deployed by Madliena Shipping (Jersey) Ltd., are 21-meter 15DWT crew transfer catamarans powered by MTU engines of 965 bhp each at 2,250 rpm, for speeds up to 26 knots.

The decks include multiple lash-down points for cargo, and the decks can fit a 10-foot container, if required. Other features include a 6.5-foot knuckle crane, a removable A-frame and a 40-meter deck reel fuel transfer system.

Each vessel, with a crew of four, can accommodate 12 passengers and provide showers, multimedia capacity and a full galley.

Don't miss the latest wind energy news -- register to receive NAW's news headlines.



Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Play for Pink
NAW Mobile

Power Climber_id1659
NRG Systems JWT_id1677
Upwind Solutions_id1629
SandC Electric_id1674
Mankiewicz_id1700
Trachte Inc._id484
Castrol
AWEA_id1658