ABB_id2059
in News Departments > New & Noteworthy
print the content item

The Massachusetts Clean Energy Center (MassCEC) says it has received three construction bids for the development of the New Bedford Marine Commerce Terminal, a facility to support the construction, assembly and deployment of offshore wind projects.

According to the MassCEC, bids were received from Braintree, Mass.-based Cashman Equipment Corp., Quincy, Mass.-based Cashman-Weeks NB and Oak Brook, Ill.-based Great Lakes Dredge & Dock Company LLC.

The agency will review the submitted bids and expects to sign a general contractor by the end of May. Staff and engineers will review the bid requirements for compliance and determine the lowest qualified bidder, the agency notes.


Hybrid Energy Innovations 2015

Trachte_id2056
Latest Top Stories

The Song Remains The Same: AWEA Says Stable Policy Can Protect U.S. Wind Investment

Although the U.S. wind industry added more than four times the amount of wind in 2014 compared with 2013, predictable policy is needed to sustain its long-term success.


High Net-Worth Investors Claim 'All Of The Above' On Energy, Renewable And Otherwise

According to a recent Morgan Stanley poll, high-dollar investors favor investment in renewable energy technologies, such as wind and solar.


U.S. Wind Power Installations Surpassed 4.7 GW Last Year, Although China Still Leads

Bloomberg New Energy Finance reports that U.S. wind installations came back in a big way from a disappointing 2013.


IRS Specifies Performance, Quality Standards For Small Wind Turbines

The Internal Revenue Service (IRS) recently issued guidelines creating safety and performance standards for small wind turbines to be eligible for the 30% investment tax credit.


Hot Times North Of The Border: Canada Tops Previous Record For Installed Wind Capacity

For the second consecutive year, Canada's wind market has bested the country's previous mark for new installations.

Hybrid Energy Innovations 2015