in News Departments > Projects & Contracts
print the content item

The New York State Public Service Commission (PSC) has authorized the construction and operation of two wind energy projects in the towns of Cohocton and Avoca in Steuben County, NY. The proposed facilities will have a combined electric generating capacity of 127.5 MW.

In conjunction with granting Certificates of Public Convenience and Necessity (CPCN) authorization, the PSC plans to impose conditions on the Cohocton and Dutch Hill projects to ensure safe, reliable and adequate service using the wind turbines, the commission adds.

An environmental review conducted pursuant to the State Environmental Quality Review Act, Article 8 of the Environmental Conservation Law found that additional environmental mitigation measures will be required by the town of Cohocton.


Trachte Inc._id1770
Latest Top Stories

Wind And Solar Are Catching Up With Nuclear Power, Says Report

A new report from the Worldwatch Institute says nuclear energy's share of global power production is steadily shrinking. Meanwhile, renewables' share keeps growing.


Could New Desert Plan Spell The End Of California Wind Energy Development?

The California Wind Energy Association says it is disappointed with the draft Desert Renewable Energy Conservation Plan, which was recently released by state and federal agencies.


New U.S. House Bill Includes Wind PTC Extension

U.S. representatives have introduced the Bridge to a Clean Energy Future Act of 2014, which would extend the production tax credit (PTC) and other provisions through 2016.


Utility-Scale Wind And Solar Keep Getting Cheaper

A new study measures the levelized cost of energy from various technologies and suggests that the costs of utility-scale wind and solar power are catching up with those of traditional sources, even without subsidies.


The Song Remains The Same: Ontario Seeks More Science Before Lifting Offshore Ban

The Ontario government says the nearly four-year-old offshore wind moratorium will remain in place until the province fully understands the technology’s impact on the environment.

Canwea_id1984
Renewable NRG_id1934
UnitedEquip_id1995
Future Energy_id2008