in News Departments > FYI
print the content item

Siemens AG has shipped its first wind turbine blades that were manufactured at the company's new blade factory in Fort Madison, Iowa. According to Siemens, blades for SWT-2.3-93 wind turbines are bound for the Abilene, Texas-based Sweetwater Wind Farm, which is jointly owned by Babcock & Brown and Catamount Energy. Siemens was awarded a contract for 35 of its SWT-2.3-93 wind turbines as well as wind turbine supply and service, maintenance and warranty agreements.

"By expanding our wind turbine blade manufacturing capacity in the U.S., we are able to play a more significant role in helping the U.S. meet its growing electricity demand with clean wind energy and zero carbon emissions," says Randy Zwirn, president and CEO of Siemens Power Generation Inc.

Siemens anticipates it will employ approximately 400 people in its U.S. wind industry by the end of September.

IowaDeptEconDevel_id1863

Trachte Inc._id1770
Latest Top Stories

Report Disputes U.S. Agency's Renewable Energy Projections

A new analysis from the Sun Day Campaign says renewables are slated to provide 16% of U.S. generating capacity by 2018 - over 20 years earlier than forecast by the Energy Information Administration.


Kansas Renewables Mandate Survives Yet Another Attack, But Is It Too Early To Celebrate?

Over the past three years, some legislators have tried to either weaken or repeal the state's renewable portfolio standard, which requires Kansas utilities to reach 20% renewables by 2020.


AWEA Highlights U.S. Wind Success Stories Of 2013

Despite a 92% drop in new capacity last year, the sector still has myriad reasons to celebrate, according to a new report from the American Wind Energy Association.


Feds List New Bird Species As Threatened - Should Wind Developers Be Worried?

The U.S. Fish and Wildlife Service is designating the lesser prairie-chicken as threatened under the Endangered Species Act. An expert explains how this might affect the wind industry.


Senate Committee Passes Bill With Two-Year PTC Extension

The Senate Finance Committee has voted on a tax extenders package, which includes both the production tax credit (PTC) and investment tax credit, and sent it to the floor.

Acciona_id1907
WomenofWind_id
UEA_id1896
JLG_id1900
AWEA_id1886
bonfiglioli_id1913