North American Windpower
GE Technology To Regulate Wind Turbine Curtailment At Maine Wind Farms
in News Departments > Projects & Contracts
print the content item
GE will install its WindCONTROL software at two First Wind-owned and -operated wind projects in Rollins and Stetson, Maine.

The Rollins site features 40 GE 1.5-77 turbines, and the Stetson project contains 55 GE 1.5-77 turbines. The GE technology will regulate curtailment by monitoring and controlling the wind turbines' ramp rates, thus easing power spikes and putting less strain on the turbine than would occur with starts and stops, GE explains.

"The effect of curtailment on wind turbines has been an area of concern for us," says EJ Martin, First Wind’s vice president of operations. “The application of GE’s WindCONTROL technology to our wind turbines in Maine will help the units maximize energy capture while mitigating the strain on our units as we regulate power production.”

Using GE’s WindCONTROL, turbine owners can earn back power that may have been lost due to inefficient controls for meeting curtailment. The software automatically controls the output of each wind turbine at the wind farm, thus avoiding the starting and stopping of units to meet power demand, GE says.

GE previously announced that First Wind selected GE as its service provider for First Wind’s entire fleet of 264 GE wind turbines at eight sites across the U.S. The eight-year service agreement expanded upon existing contracts with First Wind and was the first contract to cover an entire fleet of wind turbines signed by GE at that time.

Don't miss the latest wind energy news -- register to receive NAW's news headlines.

Iowa Dept Economics

Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Follow Us on Twitter
NAW Mobile

Power Climber_id1660
Upwind Solutions_id1629
SandC Electric_id1674
Mankiewicz_id1700
NRG Systems JWT_id1677
Trachte Inc._id484
Castrol
AWEA_id1658