in News Departments > New & Noteworthy
print the content item

Renewable energy projects - including wind, solar, geothermal, biomass and water - accounted for 41.14% of new U.S. electrical generating capacity installed in October and represent 46.22% of the capacity added in the first 10 months of this year, finds the Federal Energy Regulatory Commission's (FERC) latest Energy Infrastructure Update.

In October, 10 new wind power projects totaling 594 MW came online, as well as 10 solar projects (59 MW), three biomass projects (69 MW) and one water power project (5 MW), according to the SUN DAY Campaign, a nonprofit research firm that promotes sustainable energy technologies.

In the first 10 months of the year, 92 wind energy projects totaling 5.403 GW have come online, as well as 167 solar projects (1.032 GW), 79 biomass projects (409 MW), seven geothermal projects (123 MW) and nine water power projects (12 MW), the report notes. Collectively, these total 6.979 GW, or 46.22%, of all new generating capacity added since the beginning of the year.

By comparison, new natural-gas additions since Jan. 1 totaled 67 projects (5.702 GW), or 37.8%, while three new coal projects added 2.276 GW (15.1%). Nuclear and oil represented just 0.8% and 0.1%, respectively, of new capacity additions.

The new renewable energy generating capacity added this year represents a 47.7% increase over the level recorded for the same period in 2011.



Trachte Inc._id1770
Latest Top Stories

Quebec Government Postpones Wind Power RFP; No New Date Scheduled

The request for proposals (RFP) is part of an overall 800 MW wind power tranche that will serve as a bridge to the next phase in the province's energy future.


Setting The Record Straight: How Many Birds Do Wind Turbines Really Kill?

Several peer-reviewed studies are more or less in agreement with avian mortality rates caused by wind turbines. However, one study, which is wildly off from the others, is most often cited in the media. Why?


Six Takeaways From The IRS' Start Of Construction Guidance: What You Need To Know

The IRS recently issued guidance to wind developers to further spell out what "start of construction" means. Will you be covered?


Eagle Take Permits For Wind Farms - Will They Fly?

Now that the U.S. Fish and Wildlife Service has issued the first permit allowing the legal take of eagles, can wind developers expect more certainty in the agency's application process?


Despite 2013 Challenges, U.S. Wind Power Reaches All-Time Low Price

In a new report, the U.S. Department of Energy details the highs and lows of the country's wind industry last year, and the agency maintains that the U.S. sector remains strong.

Canwea_id1984
Renewable NRG_id1934
Tower Conference_id1965
UnitedEquip_id1995