in News Departments > Policy Watch
print the content item

Following several revisions to its original version, Senate Bill (SB) 3, the Renewable Energy and Energy Efficiency Bill, has passed both the House and Senate in North Carolina.

According to its text, SB 3 is designed to "promote the development of renewable energy and energy efficiency in the state through implementation of a renewable energy and energy efficiency portfolio standard (REPS)," as well as "allow recovery of certain nonfuel utility costs through the fuel charge adjustment procedure" and "allow a tax credit to contributors to 501(c)(3) organizations for renewable energy property."

The REPS will require public utilities in North Carolina to obtain 3% of their electric power from renewables by 2012, 6% by 2015, 10% by 2018 and 12.5% by 2021. Electric membership corporations or municipalities must meet the 2012, 2015 and 2018 requirements, but are exempt from the 2021 requirement.

The bill will now be sent to Gov. Mike Easley, D-N.C., for final approval.

Iowa Dept Economics

Hse SandyHook
Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Power Climber_id1660
UEA_id1698
Upwind Solutions_id1629
SandC Electric_id1674
Trachte Inc._id484
Castrol
AWEA_id1658