North American Windpower Mortenson_id1668
Airhog Debuts Nitrogen Accumulator Charging System For Wind Turbines
in News Departments > Products & Technologies
print the content item
Airhog Pneumatics, a supplier of portable high-pressure gas equipment, has released its nitrogen accumulator charging system, which has been developed specifically for the wind energy industry.

Airhog's portable Gaspac was designed to tackle one of the most dangerous, time-consuming and costly procedures on a wind farm: charging the nitrogen accumulators. The Gaspac, which consists of a 4,500-psi, 88-cubic-foot carbon-fiber air tank, weighs only 35 pounds yet holds as much usable nitrogen as a much larger and heavier steel cylinder, the company explains.

Furthermore, the Gaspac can easily be carried into the hub of most turbines, eliminating the need to hoist a steel cylinder or a 300-foot hose to the top of a turbine to charge its nitrogen accumulators, Airhog says, adding that the Gaspac can service up to four turbines a day using a two-person crew.

Don't miss the latest wind energy news -- register to receive NAW's news headlines.

Iowa Dept Economics

Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Play for Pink
NAW Mobile

Power Climber_id1660
NRG Systems JWT_id1677
Mankiewicz_id1700
Upwind Solutions_id1629
SandC Electric_id1674
Trachte Inc._id484
AWEA_id1658
Castrol