in News Departments > Products & Technologies
print the content item

Kaeufer Blade Access Systems says it has completed the final testing for its next generation of suspended work platforms.

Kaeufer says the platform is capable of accessing blades in the 60-meter class, with a distance between tower and blade tip of around 50 feet, which sets a world record for suspended work platforms that fully encircle the rotor blade.

According to the company, the platforms are the only ones available that can be used to access rotor blades on the largest wind turbines, such as REpower’s 6 MW, Gamesa’s 4.5 MW, and Vestas’ V112 models.

The company says its flagship model - of which more than 100 units are in use worldwide - recently received UL certification: the first fully UL-certified blade access system available for rotor blade access, according to Kaeufer.


Trachte Inc._id1770
Latest Top Stories

Yearly Installed Capacity Figures Already Beat 2013 Numbers, More Wind On The Way: AWEA

While the American Wind Energy Association (AWEA) lobbies Congress to extend the production tax credit, the association notes wind projects now under construction signal a vibrant 2015.


Yahoo Inks Contract To Buy Kansas Wind Power

The Internet company plans to log in to the Alexander wind project, which is being built by community developer OwnEnergy.


Could Initial Offshore Wind Projects Crash New England's REC Market?

Some are concerned that the first offshore wind projects could negatively impact pricing of renewable energy credits (RECs) in New England.


Catching Up With The DOE's Down-Select Offshore Winners

The three recipients of key U.S. Department of Energy (DOE) funding provide updates on their offshore wind demonstration projects.


Texas Comptroller Attacks Wind Power, And Industry Fights Back

Texas Comptroller Susan Combs recently released a report calling for an end to wind power subsidies. The Wind Coalition has responded, saying the report is riddled with misinformation.

Canwea_id1984
Renewable NRG_id1934