North American Windpower Suzlon_id1695
Moventas Expands Wind Turbine Up-Tower Services
in News Departments > FYI
print the content item
Wind turbine gear manufacturer Moventas says it is expanding its up-tower service. The company says it can perform on-site inspections and repairs of high-speed, low-speed and intermediate assemblies for both its own gearboxes and competitor models.

By utilizing a mobile service unit and a small hydraulic crane, the Moventas up-tower repair eliminates the costs associated with mobilizing large boom and secondary cranes that are usually required to bring the complete gearbox down from the nacelle, the company explains.

This method also reduces costs related to shipping and wind turbine downtime, according to Moventas.

The company says it is currently building multiple self-contained mobile workshops specifically designed to perform this service at the wind site. Five mobile workshops will be located in North America, and two will be located in Germany and Spain before the end of the year.


Don't miss the latest wind energy news -- register to receive NAW's news headlines.

Iowa Dept Economics

Latest Top Stories

As U.S. DOJ Investigates, Duke Works Adaptive Management Plan

With previous golden eagle fatalities reported at two company-owned wind farms in Wyoming, Duke Energy Renewables is going to great lengths to protect raptors.


DOE To Recast Landmark 20% Wind Energy Report; Study Looks Back, Ahead

The U.S. Department of Energy will update its 20% Wind Energy By 2030 report, which indicated increased levels of wind penetration for the U.S. is not only possible but feasible.


Wind Energy Procurement Top Of Mind For Big-Name Companies

With greater frequency, top-tier companies are discovering the economic and environmental power of wind energy and upping their investments in the resource.


WINDPOWER Panelists Issue A Call To Arms: Protect RPS Mandates

Votes on several legislative bills concerning state renewable portfolio standards (RPS) are nearing. How can you help protect and maintain these development drivers?


Wind Industry Still Awaits First Eagle-Take Permit Under BGEPA

The first wind developer to apply for a take permit under the Bald and Golden Eagle Protection Act has withdrawn its application.

Related Stories
Hse SandyHook
Follow Us on Twitter
NAW Mobile

UEA_id1698
Power Climber_id1659
NRG Systems JWT_id1677
SandC Electric_id1674
Mankiewicz_id1700
Trachte Inc._id484
AWEA_id1658
Castrol